Separate method×ヨシザワ建築構造設計 - List of Manufacturers, Suppliers, Companies and Products

Separate method Product List

1~1 item / All 1 items

Displayed results

"Separate construction method" allows for construction to be done in halves without stopping the factory!

Recommended for factories with no space around existing buildings. You can rebuild in phases while maintaining operations.

The "Separate Construction Method" is a technique that allows for the rebuilding of a facility in phases (Phase 1 and Phase 2) without demolishing the existing building, while maintaining operations throughout the construction period. First, machinery is moved to the Phase 2 side, and construction begins on the Phase 1 side. Once Phase 1 is completed, the machinery is moved back from Phase 2 to Phase 1. After that, Phase 2 is completed, allowing the factory to operate at full capacity without any disruption. This method is recommended for factories that have no space around the existing building, and it is also possible to plan the production line across different floors. 【Features】 - Construction is done in halves without stopping the factory - Rebuilding is done in phases without demolishing the existing building - The factory can operate at full capacity without disruption - Recommended for factories with no space around the existing building - Planning the production line across different floors is possible *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration